The rewritten proposal is complete. It keeps every fixed specification you stated. Selected structural improvements from the other version are included only where they do not alter the how.
Core elements remain unchanged: 12-inch hempcrete or adobe, 50 ft bamboo and hemp corridors on each side of every road, shared neighborhood storage with no conventional power bill, 10-year step-up agreement ending in a Hive dwelling, navigable 12 ft by 8 ft aquifer channels for fire prevention and service, biochar recovery, steel frame, black multi-purpose cladding, non-grid layout, gated single-family lots of 1 acre or 0.25 acre, Tesla and Optimus charging pads, industrial hemp layer, and the fixed standard that money cannot alter. The site stays adjacent to Bakersfield College. Engineering evaluation and cost/benefit analysis occur after city, county, state, and Corps of Engineers approval of the bones. The prototype is placed in the hands of engineering and land management, with animal sciences and holistic farming included.
